„The results of the last three quarters create for KGHM good conditions to carry out its ambitious investment program while maintaining the safe financial condition of the Group. We are focused on projects which enhance the efficiency of the core business, secure long-term production and open new development possibilities. In Poland we are modernising the core production business and developing our own sources of energy, while abroad we are increasing the scale of Sierra Gorda and strengthening cooperation with global partners. Despite the good financial results, we see numerous challenges arising from the dynamically-changing situation as regards energy carriers, and also in recent weeks on commodities markets – circumstances beyond our control. This is why we are introducing many initiatives aimed at optimising our costs and operating efficiency. We want our current and future results to consistently support the long-term value of KGHM for our shareholders and at the same time to guarantee KGHM’s stable development over the long term,” says Remigiusz Paszkiewicz, President of the Management Board of KGHM Polska Miedź S.A.
Results and efficiency
Revenues earned by the Group amounted to PLN 36.7 billion and were more than +42% higher compared to the corresponding prior-year period. An important factor, apart from the high sales volumes, responsible for the increase in revenues at the KGHM Group level, was the high prices of copper and silver. Positive impact on the level of recorded revenues also came from the contracting policy and the process of managing FX risk and the risk of changes in commodities prices. The Group also recorded a drop in C1 cost, mainly thanks to the high valuation of byproducts, i.e. silver and precious metals. The high revenues and stable cost base enabled the achievement of consolidated EBITDA of nearly PLN 13.2 billion, or an 83% increase year-to-year.
KGHM during a period of good conditions is maintaining cost discipline. In the first 9 months of 2026 expenses by nature of the KGHM Group excluding the minerals extraction tax (KGHM paid the MET under maximum rates for August and September), labour costs and purchased metal-bearing materials rose only by 5%, despite the substantially higher market prices of electricity, natural gas and fuels. This was mainly the result of the effective execution of the energy carriers contracting policy and of systematic improvement in the efficiency of production and auxiliary processes.
Production
In the first three quarters of 2026, production of payable copper by the KGHM Group amounted to 533 thousand tonnes and was 1% higher than in the corresponding prior-year period. The Group also produced 1 073 tonnes of silver, or 8% more than in the prior year. The results achieved were due among others to maintaining the high capacity of the Core Production Business and stable work by the mining and metallurgical divisions. Production by the domestic assets in Poland amounted to 440.9 thousand tonnes of copper and 1 049 tonnes of silver.
An important part in the Group’s production results was also played by the international assets. Production of payable copper by the Sierra Gorda mine amounted to 63.1 thousand tonnes (for the 55% share held by KGHM), while production by the segment KGHM INTERNATIONAL LTD. amounted to 29.3 thousand tonnes. During this same period the Group produced 112 thousand troy ounces of precious metals and 2.3 million pounds of molybdenum.
Investments and development
In the first three quarters, the value of investments carried out by the Company amounted to nearly PLN 2.5 billion versus PLN 2.2 billion in the prior year, or an increase of 9 percent year-to-year. The Company is engaged in building three new shafts, as well as a variety of initiatives related to improving working conditions in the mines, the energy transformation and deposit exploration.
In the third quarter, KGHM completed, ahead of schedule, the largest maintenance shutdown of the Głogów Copper Smelter and Refinery in its history. This work comprised key installations and equipment of the Głogów II Copper Smelter and Refinery. Thanks to this modernisation it will be possible to extend the period between maintenance shutdowns from four to five years, enabling an increase in the efficiency of the Core Production Business, and will facilitate the restriction of metallurgical production costs. KGHM is also continuing investments in energy security. In July the Company signed an agreement with the National Environmental Protection and Water Management Fund for preferential financing to build five photovoltaic installations with a total capacity of 19.4 MW. The energy thus generated will be used to meet the Company’s own needs.
One of the KGHM Group’s most important development projects is the expansion of the Sierra Gorda mine in Chile. The value of this investment, comprising the construction of a fourth grinding line, is estimated at around USD 725 million (on a 100 percent basis). This is one of the largest Polish investments abroad. The new installation will increase the mine’s annual processing capacity from around 48 million to 60 million tonnes of ore, and copper production by around 20 percent. This expansion is also aimed at improving the operational efficiency of Sierra Gorda and reducing C1 production cost. KGHM is also continuing exploratory work in the Catabela Northeast region, which in future could prolong the life of the mine. The Group is also enhancing cooperation with its international sector partners. A letter of intent was signed with BHP, opening the possibility of analysing joint ventures, including exploration and development projects.
KGHM is also engaged in preparations for the PUCK project, involving the building over 10+ years of the first polyhalite mine in Poland on the explored „Mieroszyno” deposit. The Company is also analysing and participating in discussions as regards potential acquisitions in foreign markets.
Key financial and production data of the KGHM Group
|
item |
Q1 - Q3 2026 |
Q1 - Q3 2025 |
Change |
|
Revenues |
PLN 36.7 billion |
PLN 25.9 billion |
+42% |
|
Adjusted EBITDA |
PLN 13.2 billion |
PLN 7.2 billion |
+83% |
|
Profit for the period |
PLN 7.5 billion |
PLN 1.0 billion |
x7.4 |
|
Payable copper production |
533 kt |
527 kt |
+1% |
|
Silver production |
1073 tonnes |
993 tonnes |
+8% |
|
C1 cost |
2.54 USD/lb |
2.60 USD/lb |
-2% |
|
Net debt / adjusted EBITDA |
0.3 |
0.8 |
x |